人工安装螺栓,站在脚手架上安装 🇨🇳 | 🇬🇧 Manual installation of bolts, mounted on scaffolding | ⏯ |
脚手架 🇨🇳 | 🇫🇷 Échafaudage | ⏯ |
进厂准备25吨吊车,安装钢柱 🇨🇳 | 🇬🇧 Into the factory to prepare 25 tons of crane, installation of steel columns | ⏯ |
综合过滤第一层钢立柱24根的安装 🇨🇳 | 🇬🇧 Integrated filtration installation of 24 steel columns on the first layer | ⏯ |
设备正在安装 🇨🇳 | 🇬🇧 The device is being installed | ⏯ |
三脚架 🇨🇳 | 🇬🇧 Tripod | ⏯ |
一架钢琴 🇨🇳 | 🇬🇧 A piano | ⏯ |
千手柱间 🇨🇳 | 🇯🇵 千手柱間 | ⏯ |
设备正在被安装 🇨🇳 | 🇬🇧 The device is being installed | ⏯ |
我们来安装设备 🇨🇳 | 🇷🇺 Давайте установим оборудование | ⏯ |
千手柱间 🇨🇳 | 🇯🇵 千手柱の間 | ⏯ |
手脚 🇨🇳 | 🇬🇧 hands and feet | ⏯ |
内侧脚扭伤了,之前 🇨🇳 | 🇬🇧 The inner foot sprained before | ⏯ |
四柱牢之术 🇨🇳 | 🇯🇵 四柱の堅固な術 | ⏯ |
我之前告诉手 🇨🇳 | 🇬🇧 I told the hand before | ⏯ |
现在去厂里安装设备 🇨🇳 | 🇬🇧 Now go to the factory to install the equipment | ⏯ |
搭三班之前用包了妻子 🇨🇳 | 🇬🇧 I wrapped my wife in the bag before taking the three classes | ⏯ |
展台设计搭建 🇨🇳 | 🇬🇧 Booth design and construction | ⏯ |
3米钢框梁20根及4.5米管支架3根的安装 🇨🇳 | 🇬🇧 Installation of 20 and 4.5-meter tube brackets of 3 metersteel frame beams | ⏯ |
1600几栏目 🇨🇳 | 🇬🇧 1600 columns | ⏯ |
综合过滤第一层钢立柱24根的安装 🇨🇳 | 🇬🇧 Integrated filtration installation of 24 steel columns on the first layer | ⏯ |
重新安装 🇨🇳 | 🇬🇧 Re-installing | ⏯ |
枪钢枪,钢枪,钢枪钢枪 🇨🇳 | 🇬🇧 Gun, steel, steel, steel | ⏯ |
列如 🇨🇳 | 🇬🇧 Columns such as | ⏯ |
进厂准备25吨吊车,安装钢柱 🇨🇳 | 🇬🇧 Into the factory to prepare 25 tons of crane, installation of steel columns | ⏯ |
装系统 🇨🇳 | 🇬🇧 Installing the system | ⏯ |
Installing: About 17 minutes remaining 🇨🇳 | 🇬🇧 Installing: About 17 minutes | ⏯ |
钢枪钢枪 🇨🇳 | 🇬🇧 Steel gun steel gun | ⏯ |
钢枪,钢枪钢枪 🇨🇳 | 🇬🇧 Steel gun, steel gun | ⏯ |
钢筋 🇨🇳 | 🇬🇧 Steel | ⏯ |
钢色 🇨🇳 | 🇬🇧 Steel | ⏯ |
钢材 🇨🇳 | 🇬🇧 Steel | ⏯ |
钢铁 🇨🇳 | 🇬🇧 steel | ⏯ |
不锈钢和碳钢 🇨🇳 | 🇬🇧 Stainless steel and carbon steel | ⏯ |
安装保护板 🇨🇳 | 🇬🇧 Installing a protective plate | ⏯ |
钢板 🇨🇳 | 🇬🇧 Steel plate | ⏯ |
不锈钢 🇨🇳 | 🇬🇧 Stainless steel | ⏯ |
钢丝 🇨🇳 | 🇬🇧 Steel wire | ⏯ |